Ramp index

مؤشر الالتزام بالخطة

Canon · Playbook 2.0Added in version 1.0

Definition

The ramp index is the measure of whether a new branch is reaching its approved model: cumulative actual contribution divided by cumulative planned contribution to date. It is read weekly and judged at day 90, where the Playbook defaults are 0.9 or more on plan, 0.75 to 0.9 a 30-day recovery plan, and below 0.75 escalation.

In plain words

Is the new branch keeping to its plan, or falling behind it?

Also searched as

  • ramp-up index
  • new branch ramp
  • day-90 ramp
  • ramp curve
  • مؤشر الالتزام بالخطة

Formula

Ramp index = Cumulative actual contribution ÷ Cumulative planned contribution (to date)

Canonical thresholds

Ramp index at day 90Playbook default, to calibrate
ThresholdVerdict
≥ 0.9On plan
0.75–0.930-day recovery plan with a named owner
< 0.75Escalate; pause same-format openings in the city

Source: Playbook §2 · Gate 3: The opening (first 90 days) · Playbook §6 · The day-90 review

Where it is used

In the Doctrine and the Playbook

Related terms

Should I open a new branch? Run the numbers

How to cite this definition

Alhajj, S. (2026). “Ramp index”. In The Revenue Engineering Lexicon, version 1.0. Riyadh. https://seiflden.com/lexicon/ramp-index/

Back to the Lexicon